Layout scheme and flow condition analysis for the upper approach channel of Yanzhou Junction Ship Lock
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Aiming at the problem that the upstream approach channel of Yanzhou Hub Ship Lock renovation project cannot be arranged as a straight and fully sheltered approach channel due to flood discharge,ecological protection,and river regime constraints,physical model tests are used to study the navigable flow conditions of the upstream zigzag non-sheltered approach channel.A 1:100 scale physical model is developed to analyze the navigable flow conditions in the approach channel.The conclusions indicate that:1) Although the fully sheltered long guide wall scheme meets the navigable flow condition requirements,the flow velocity at the 15 m gap reaches 5.23 m/s,causing serious local scouring.2)Without lowering the navigation standards for ships entering and leaving the lock,a proposal combining hydrological statistical analysis suggests setting separate berthing sections for the medium-dry season and the flood season.During the medium-dry season (Q≤2,500 m3/s),the maximum flow velocity in the berthing section is 0.50 m/s,which meets the code requirements.During the flood season (Q >2,500 m3/s),the maximum transverse velocity in the entrance area is 0.44 m/s,the maximum longitudinal velocity is 1.23 m/s,the maximum transverse velocity in the connecting section is 0.21 m/s,and the maximum longitudinal velocity is 1.79 m/s,all of which satisfy the code requirements.Furthermore,by the use of the upstream anchorage for vessel waiting area,and comprehensively considering the number of affected days and information-based scheduling methods,the impact on ship navigation capacity is limited.The research results can provide a reference for similar non-sheltered ship lock approach channels.

    Reference
    Related
    Cited by
Get Citation

ZHOU Qiankai, ZHOU Ding, ZHOU Qin, et al. Layout scheme and flow condition analysis for the upper approach channel of Yanzhou Junction Ship Lock[J]. Port & Waterway Engineering,2026(5):110-117.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 21,2026
  • Published:
Article QR Code