Scheme for old approach bridge renovation in Luojing port area
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    There are the insufficient bearing capacity,inadequate operational space,and structural aging of the old approach bridge in Luojing port area.To achieve scientific decision-making for the renovation scheme,we build a quantitative evaluation system with 5 primary indicators(progress,cost,safety,quality,environmental protection) and 13 secondary indicators by the analytic hierarchy process(AHP).After experts built judgment matrices by the 1-5 scaling method and passed consistency checking,we identify cost and progress as core evaluation dimensions,and quantitatively compare three schemes including scheme 1(adding piers to reduce span to 13.5 m with existing piles),scheme 2(supplementing piles to maintain 27 m span),and scheme 3(full demolition and reconstruction of a 40 m approach bridge).The results show scheme 1 scored highest(4.16/5),outperforming scheme 2(3.58) and scheme 3(2.45),with 20% lower direct costs and 30% shorter construction period.Although scheme 1 reduces flood discharge section,optimizing pile layout and anti-collision measures mitigate flood impacts.AHP can effectively solve the problem of multi-objective decision-making,providing a replicable quantitative framework for port approach bridge renovation and referencing similar projects.

    Reference
    Related
    Cited by
Get Citation

LIU Aoxiang, LIU Guobao. Scheme for old approach bridge renovation in Luojing port area[J]. Port & Waterway Engineering,2025(S1):100-105.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 18,2025
  • Published:
Article QR Code