    In view of the close distance between Shuangqiao junction and Xinjianghai junction in the Xinjianghai River waterway,the small water level difference,and the long normal level period in the upstream and downstream,this paper carries out the technical and economic analysis of retaining or canceling the Shuangqiao cascade scheme.The results show that canceling the Shuangqiao cascade scheme has a great influence on regional flood control,drainage,water system connectivity,and water quality.The total investment and the operation cost of the water system restoration project are high,and the internal rate of return of the project is low.In contrast,retaining the Shuangqiao cascade scheme to maintain the existing water system layout can ensure that the ship lock can be opened and jointly dispatched with the ship lock of the Xinjianghai River,so as to share the anchorage to be locked,which is economically reasonable.

    Reference
    Related
    Cited by
Get Citation

罗业辉,柯林杰,李子洋.新江海河航道梯级布置方案技术经济分析[J].水运工程,2023,(6):131-136

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 13,2023
  • Published:
Article QR Code