Installation technology of wave shield of air-permeable breakwater under unsupported condition
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    There are many shortcomings in traditional installation of the breakwater wave board,such as short operating time during high tide,the difficulty of positioning,and the poor reinforcement effect of the components.This paper introduces an improved process for the installation and construction of the breakwater wave board of a yacht club project,i.e.installing steel plates on the pier of the breakwater and installing steel pendants on the top of the wave board,and connecting them during construction to achieve unsupported installation of the wave shield.This paper also elaborates the main construction procedures and carries out the force analysis of the wave baffle and breakwater. The results show that all parameters of this lifting method meet the installation requirements.This construction process may serve as reference for the installation of other unsupported components of the breakwater.

    Reference
    Related
    Cited by
Get Citation

王 朋,吴旭彬,樊德智.透空式防波堤下挡浪板无支撑安装施工技术[J].水运工程,2020,(S1):154-158

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 15,2020
  • Published:
Article QR Code