    Abstract:

    The hydro-junction for water diversion project located at branch entrance of the lower tidal reach usually faces flow condition problem through sluice gate.Due to limited land conditions,the hydro-junction has to be built closed to the main river outside the branch entrance and keeps an open layout.As a result,branch mouth flow is significantly affected by the asymmetric tidal flow of main river and the cross flow at the entrance area of the sluice gate.Based on Jiepai junction,downstream and upstream flow condition is studied.

    Reference
    Related
    Cited by
Get Citation

何 勇,李寿千,吴 忠,陆 奇,朱 昊,朱明成.感潮河段支流口门多功能枢纽整体水流条件*[J].水运工程,2018,(4):79-83

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: April 09,2018
  • Published:
Article QR Code