Connection and closure gap arrangement for toe-shooting riprap dike
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to effectively use and integrate dredged materials into the port land formation works,a supporting dike of about 18 km long had been constructed in the Phase I of 300,000 DWT navigation channel development works at Lianyungang Port.The dike structure was made up of toe-shooting riprap dike and sandbag sloping dike,so these two different types of structure had to be connected properly during construction.This paper introduces the design solution of the connection between these two dikes as applied in the Phase I channel works,and accordingly presents the closure gap arrangement as well.

    Reference
    Related
    Cited by
Get Citation

蔡 军,张林海,侯海伟,马兴华,殷 昕.爆破挤淤堤与充填袋斜坡堤衔接方案[J].水运工程,2017,(11):172-175

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 17,2017
  • Published:
Article QR Code