Elevation prediction system for dredging and reclamation
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The dredge and survey platform including a series of sampling,sampling preparation and vacuum preloading model test devices is designed and developed which can execute exploration,sampling and monitoring in reclamation soft soil.Taking a series of means including drilling and sampling,settlement monitoring,indoor soil test,model test and so on,combining physical index method,layerwise summation method,one-dimensional finite strain method of reclamation soil,and some settlement computation methods of in-situ soil and software calculation system,a software and hardware prediction system of reclamation elevation in reclamation area is formed.The system is used in a reclamation area behind 6#~8# berth in Binzhou port.The result shows that the reclamation elevation shall not be less than 8.55 m if the foundation will be treated by vacuum preloading method and the elevation should reach 3.5 m after treated .

    Reference
    Related
    Cited by
Get Citation

张云冬,程 瑾,刘西平,马永刚.疏浚吹填高程预测系统[J].水运工程,2017,(8):72-76

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 18,2017
  • Published:
Article QR Code