    In the clearing reef project,because of blasting technology limitation,the reefs whose compressive strength is more than 70 MPa cannot be cleared.Aiming at the problem,the study involved experiments conducted on the dredging equipments and parameter to improve process.Adopting drilling,installing steel ingot,and rock drilling construction methods,the super-hard reefs was effectively cleared.