Abstract:Based on the analysis of the construction technique of the domestic and foreign deep water precise stone filling,the underwater real-time measurement and control system and the deep water droping and filling equipment are designed.By testing and retesting section,the technique of riprap elevation data and the plane position deviation are controlled within specifications,which has a high degree of automation,strong adaptability to operating conditions,high efficiency operation.