The condition of constructing a level-4 navigation channel at the reach from Laobaokou to Xinxu
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The flow level comparing method and the stable waterway depth estimating method were adopted in the fine reach to research the water depth that can be reached when this river is under the influence of factors such as flow,slope,and bed roughness.Furthermore,according to the planned ship type and the current situation of the ship type at the watershed of Xijiang river,the dimension standards for constructing a level-4 navigation channel was put forward,and the feasibility of constructing a level-4 channel at this reach was comprehensively analyzed.

    Reference
    Related
    Cited by
Get Citation

曾亚东.老堡口—新圩河段Ⅳ级航道建设条件分析[J].水运工程,2016,(8):135-138

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 18,2016
  • Published:
Article QR Code