Construction technology of ultra-long steel sheep piles for Luoyuan bay Luneng port
DOI:
CSTR:
Author:
Affiliation:

Xiamen Branch of Bureau of CCCC Third Harbor Engineering Co., Ltd., Xiamen 361006, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    A berth adopts the beam-slab high-pile structure with a sheeting pile front wall of BOX pile and AZ pile which are rare in China. This article, with a main line of BOX Pile and AZ pile injection technology and under the condition of a lack of corresponding advanced technology in construction, through an experimental comparison of the pile making (welding technology), shipment (the setting of lifting points), and driving technology,proposes relevant technical measures, and summarizes the quality control measures. By this, we cut down the construction cost, speed up the construction, and guarantee the engineering quality.

    Reference
    Related
    Cited by
Get Citation

陈委深.罗源湾鲁能码头超长钢板桩施工技术[J].水运工程,2011,(08):155-157

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 10,2012
  • Published:
Article QR Code