Side friction analysis during pulling of steel sheet pile and equipment selection
DOI:
CSTR:
Author:
Affiliation:

Bohai Oil Harbor Engineering and Construction Co., Ltd., Tianjin 300452, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Pile deflection and great inclination often occur due to obstruction or hard pile sinking during pile penetration into the design depth. In such situation, the pile should be pulled out and then driving again.Therefore, whether the hammer meets the need of pile extracting should be taken into account during hammer selection. Based on the analysis of the interaction between pile and soil during pile pulling, and combining the renovation engineering of berths No.1 to No.4 of the old port area of Basuo port, we select pile pulling equipments, and further analyze the relationships among the pile pulling, soil property and pile length.

    Reference
    Related
    Cited by
Get Citation

韩雪艳,顿军华,赵敬考.钢板桩动力拔桩过程中桩侧摩阻力分析及设备选型[J].水运工程,2011,(08):146-149

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 10,2012
  • Published:
Article QR Code