Settlement and displacement observation of Caofeidian universal terminal phase II engineering
DOI:
CSTR:
Author:
Affiliation:

No.5 Engineering Company Ltd. of CCCC First Harbor Engineering Co., Ltd., Qinhuangdao 066000, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Caofeidian universal terminal phase II engineering adopts the caisson gravity structure, and the rubble bed construction employs hierarchical compaction and blasting ramming, which were applied for the first time in Caofeidian quays. Comprehensive observations of settlement and displacement at various stages are executed in the construction process. The analysis of the data adopted may serve as a reference for similar projects.

    Reference
    Related
    Cited by
Get Citation

李小民,谢连仲,张爱娜,郝春庆.曹妃甸通用码头二期工程沉降位移观测分析[J].水运工程,2011,(08):65-69

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 10,2012
  • Published:
Article QR Code