On improvement of navigation lock capacity at Changzhou Complex
DOI:
CSTR:
Author:
Affiliation:

1. Guangxi Port and Waterway Bureau, Nanning 530012, China;2. School of Transporation, Southeast Uninversity, Nanjing 210096, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Changzhou complex and lock have promoted effectively the transport capacity of the Xijiang waterway. However, with the increase of traffic, the existing navigation lock facilities can not meet the traffic demand. In order to ease the congestion and delay of the navigation locks, we analyzed the lock’s traffic in recent years, and forecast its capacities from 2010 to 2015 based on a new analytical model for the average lockage tonnage. Some suggestions were put forward to improve the existing lock’s capacity, including the lock management mode, standardization and enlargement of vessels, lock scheduling, engineering measurement, etc.

    Reference
    Related
    Cited by
Get Citation

庞雪松 ,潘荣友,廖鹏.提高长洲枢纽现有船闸通过能力对策研究*[J].水运工程,2011,(04):114-119

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 28,2012
  • Published:
Article QR Code