Selection of pile foundation types for Shanghai port Luojing harbor phase II ore terminal
DOI:
CSTR:
Author:
Affiliation:

CCCC Water Transportation Consultants Co., Ltd., Beijing 100007, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Shanghai port Luojing harbor phase II ore terminal locates at Luojing district of Baoshan in the south coast of the Yangtze estuary. It is a specialized 200 000 DWT bulk cargo terminal. Considering the geologic,topographic, technological and loading conditions, we may adopt RC piles, PHC pipe piles and steel pipe piles for the terminal. According to the section design, we make comparisons on the technology, economy, construction, as well as the impact on the environment. It is concluded that the PHC pile is the type with the optimum technology,the least cost and easy installation under the loading condition of specialized bulk cargo terminals. Moreover, this type of pile has the least impact on the environment.

    Reference
    Related
    Cited by
Get Citation

李业富,董志强,罗少桢.上海港罗泾二期矿石码头桩基选型[J].水运工程,2011,(04):81-84

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 28,2012
  • Published:
Article QR Code