On multiple-lane lock’s joint scheduling plan based on computer simulation
DOI:
CSTR:
Author:
Affiliation:

1. CCCC Water Transportation Consultants Co., Ltd., Beijing 100007, China;2. Dalian University of Technology, Dalian 116023, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper analyzes influential factors of multiple-lane lock’s joint scheduling for Changzhou hydro-junction project. Based on the lockage operating procedures, a computer simulation model is built including anchorage, channel & approach channel, parallel four-lane ship lock, ship’s joint scheduling, etc. Through the simulation experiment, this paper compares the operation effect of various scheduling plans and obtained the recommended one, which provide scientific basis for the decision-making of planning, design and management of locks.

    Reference
    Related
    Cited by
Get Citation

商剑平,吴 澎,唐 颖.基于计算机仿真的船闸联合调度方案研究[J].水运工程,2011,(9):199-204

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 29,2011
  • Published:
Article QR Code