Design of Dachanwan bay container terminal phase Ⅰ engineering
DOI:
CSTR:
Author:
Affiliation:

CCCC Water Transportation Consultants Co., Ltd., Beijing 100007, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Concerning Dachanwan bay container terminal phase Ⅰ project, this paper introduces the design principle of high standard, new ideas, systematic research, integrated consideration and a combination of the present and the future, expounds the systematic and scientific develepment and construction schemes, innovative and efficient design management method, a lot of practical and innovative technology, the idea of environmental protection and energy conservation pursuited and adhered, as well as the concept of building people-based ports, which promote the advancement of container wharf design, construction, management and technological progress.

    Reference
    Related
    Cited by
Get Citation

齐彦博,邓 磊,苏逢春.大铲湾港区集装箱码头一期工程设计创新与发展[J].水运工程,2011,(9):110-115

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 29,2011
  • Published:
Article QR Code