    摘要:

    为解决桃源枢纽碍航、堵船等问题,消除安全隐患,主动适应沅水水运大通道的发展要求,拟在桃源枢纽右岸新建二线船闸。该二线船闸属于改扩建工程,其布置不仅需要满足船舶通航需求,还需统筹考虑行洪能力、对既有建筑物的影响、征地拆迁等因素,技术难度远高于新建工程。针对右岸场地新建二线船闸平面布置方案,采用1100整体定床物理模型研究4种方案下的引航道口门区通航水流条件、河道行洪能力等,确定修改方案4为推荐方案。试验结果表明,减小隔水墙长度并结合河床疏挖措施,能够有效增加河道行洪能力,减小工程实施后的水位壅高;调整航槽与水流方向一致并辅以拓宽浚深的措施,能够避免引航道口门区横向跌流,减小口门区回流强度;通过增设航槽短潜坝,可在不影响河道行洪能力的前提下,减小流向引航道的流量,从而减弱口门区回流强度。研究成果可为类似工程提供参考。

    Abstract:

    To solve the problems of navigation obstruction,ship blockage and other problems at Taoyuan Hub,eliminate safety risks,and actively adapt to the development requirements of the Yuan River water transport channel,it is planned to build a new second-line ship lock on the right bank of Taoyuan Hub.This second-line ship lock is a reconstruction and expansion project,whose layout not only needs to meet the navigation requirements of ships,but also needs to take into account factors such as flood discharge capacity,impact on existing buildings,land expropriation and demolition,etc.The technical difficulty is much higher than that of a new construction project.Aiming at the plane layout scheme of the new second-line ship lock on the right bank site,this paper adopts the 1100 integral fixed bed physical model to study the navigable flow conditions in the entrance area of the approach channel and the flood discharge capacity of the river under 4 schemes,and finally determines the modification Scheme 4 as the final recommended scheme.The test results show that reducing the length of the barrier wall combined with the measures of riverbed dredging can effectively increase the flood discharge capacity of the river and reduce the water level after the implementation of the project.By adjusting the direction of the channel and the water flow,and extending the dredging depth,the transverse fall in the entrance area of the approach channel can be avoided and the backflow intensity in the entrance area can be reduced.By adding a short submerged dam,the flow to the approach channel can be reduced without affecting the flood discharge capacity of the channel,thus weakening the backflow intensity in the mouth area.The research results can provide reference for similar projects.

    参考文献
    相似文献
    引证文献
引用本文

周 丁,李 帆,陈沁芷.桃源枢纽二线船闸平面布置方案优化试验研究*[J].水运工程,2025(9):162-173.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-09-16
  • 出版日期:
文章二维码