    摘要:

    龙头山枢纽二线船闸所处河段处于微弯河段,下游受龙头山矶头影响,整体水流条件较复杂。通过对比靠近一线船闸布置和靠近赣东大堤布置的优缺点确定船闸的闸位,采用下闸首断面分析确定二线船闸与一线船闸轴线间距,通过物理模型试验提出相应的优化措施。结果表明,闸位靠近一线船闸布置,二线船闸和一线船闸轴线间距为100 m;改建、扩建上下游隔流墙和疏挖下游右岸滩地等措施可改善一线船闸通航条件和优化二线船闸的平面布置。

    Abstract:

    The second-line ship lock of Longtoushan hub is located in a slightly curved river section,and the downstream is affected by Longtoushan rock head,resulting in complex overall water flow conditions.The position of the ship lock is determined to be arranged by comparing advantages and disadvantages of the layout near the first-line ship lock and the layout near Gandong levee.The distance between the axis of the second-line ship lock and the axis of the first-line ship lock is determined by analyzing the cross-section of the lower ship lock head.Corresponding optimization measures are proposed by the physical model test.The results show that the position of the second-line ship lock is arranged near the first-line ship lock,and the distance between the axis of the second-line ship lock and the axis of the first-line ship lock is 100 m.Measures of the reconstruction and expansion of upstream and downstream baffle walls,as well as the dredging of the right bank beach downstream,can improve navigable conditions of the first-line ship lock and optimize the planar layout of the second-line ship lock.

    参考文献
    相似文献
    引证文献
引用本文

王志鹏,邓 伟.龙头山二线船闸平面布置及通航水流条件优化[J].水运工程,2025(6):144-152.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-06-19
  • 出版日期:
文章二维码