    百龙滩水电站位于急弯河段,周边建筑物密集,受河势、地形及周边建筑物等诸多因素的限制,船闸改扩建的总体布置条件复杂。从通航水流条件、对周边建筑物影响、施工条件和工程投资等方面对闸位和船闸总体平面布置进行多方案比选,确定最优的总体布置方案。结合物理模型试验研究,采用适当减小航道弯曲半径、停泊段折线形布置的方案,解决了引航道布置空间受限问题,并通过增设丁坝、布置透水隔墙、河道局部扩挖等工程措施,有效改善了口门区通航水流条件,为弯曲河段、狭窄空间的船闸改扩建工程提供参考。

    Abstract:

    Bailongtan hydropower station is located in a sharp bend channel,surrounded by dense buildings.Restricted by various factors such as river regime,terrain and surrounding buildings,the general layout conditions for ship lock renovation and expansion are complex.Multiple schemes are compared for the lock position and general layout from several aspects,including navigation conditions,impact on surrounding buildings,construction conditions and investment,to determine the optimal general layout scheme.Combined with the physical model tests,the layout scheme of reducing the bending radius of the channel and zigzag layout of berthing section is adopted to solve the problem of limited space for approach channel.Through engineering measures such as adding groyne,installing permeable walls and excavating partial channel,the navigation conditions of upstream and downstream entrance areas are effectively improved,providing reference for the ship lock renovation and expansion in curved channel and narrow spaces.

    参考文献
    相似文献
    引证文献
引用本文

李召辉,原学明.百龙滩船闸改扩建总体布置方案[J].水运工程,2025(6):136-143.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-06-19
  • 出版日期:
文章二维码