Optimized design on bottom formwork support structure of pile-supported piers above water
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    水上高桩墩台结构在桥梁、码头等结构建设中较为常见,施工难度较大,各类措施的成本控制是施工单位优先考虑的因素之一。依托福州港三都澳港区漳湾作业区18#~20#泊位工程,对该工程变电所平台的底模板支撑结构原设计方案进行优化并调整施工组织,在保证支撑结构承载力的同时,减少支撑钢材用量,最终在依托工程中成功浇筑变电所平台并通过验收,节约施工成本81.3万元。

    Abstract:

    The structure of pile-supported pier is quite common in the construction of bridges,wharves,and other structures,and its construction is relatively difficult.The cost control of various measures is one of the factors that construction units consider first.On the basis of the project of 18# to 20# berths in Zhangwan working area of Sandu Bay area of Fuzhou Port,the original design scheme of the bottom formwork supporting structure of the substation platform for this project is optimized,and the construction organization is adjusted.The consumption of supporting steel is reduced when the bearing capacity of the support structure is ensured.Finally,the substation platform is successfully cast in the project and passed the acceptance,saving construction costs of 813,000 yuan.

    参考文献
    相似文献
    引证文献
引用本文

牛浩蕴,雷 鸣.水上高桩墩台底模板支撑结构优化设计*[J].水运工程,2025(6):63-68.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-06-19
  • 出版日期:
文章二维码