长沙枢纽三线船闸工程总体布置
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


General layout of third-line ship lock project at Changsha Hub
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对长沙枢纽三线船闸受已建双线船闸制约、边界条件(道路、已建船闸、船闸控制楼等)较为复杂的问题,进行坝址选择、船闸轴线布置、船闸平面布置方案比选以及口门区及连接段通航条件试验成果验证。船闸平面布置通过直进曲出和曲进直出方案展开对比分析,确定直进曲出方案为最优方案,提出船闸平面布置应结合用地、周边制约条件、水流条件、实施可行性、过闸效率、对已建船闸干扰程度以及投资等进行比选,结合工程实际充分利用现有资源,降低工程投资,兼顾工程施工及运营管理方便。该船闸总体布置方案和相关技术措施对周边环境复杂的多线船闸布置有借鉴意义。

    Abstract:

    To constraints of the existing double line ship locks on the third-line ship lock of Changsha hub,and complex boundary conditions (roads,existing ship locks,control buildings,etc.),this study conducts comprehensive comparisons including dam site selection,ship lock axis arrangement,and layout optimization.The navigation conditions at entrance areas and connecting segments are validated through experiments.By comparing straight entrance-curved exit layout with curved entrance-straight exit layout,the straight entrance-curved exit scheme is identified as optimal.It is proposed that the layout selection should integrate multiple factors:land utilization,surrounding constraints,hydraulic conditions,implementation feasibility,lock transit efficiency,interference with existing ship locks,and investment costs.The existing resources should be fully utilized in combination with the engineering practice to reduce the engineering investment and give consideration to the convenience of engineering construction and operation management.The general layout scheme and related technical measures of the ship lock have reference significance for the layout of multi-line ship locks with complex surrounding environment.

    参考文献
    相似文献
    引证文献
引用本文

杨 峰,周杰源,叶雅思,等.长沙枢纽三线船闸工程总体布置[J].水运工程,2025(5):122-128.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-05-19
  • 出版日期:
文章二维码