某山区河流踏步结合S形斜坡码头平面布置
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Planar layout of steps combined with S-shaped ramp wharf in mountainous river
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    山区河流岸坡地形陡、河道断面窄、水位变幅大。针对常规汽车下河斜坡码头布置形式占用岸线长、土方工程量大、工程投资较高的问题,提出一种踏步结合S形斜坡的码头平面布置形式,能够满足山区居民日常出行及生产生活物资运输的需求,同时克服常规汽车下河斜坡码头的缺点。经工程实例对比,踏步结合S形斜坡的码头平面布置形式对山区河流地形特征的适应性更强,有效减少对岸线的占用和土方的开挖回填量,降低施工难度,节省工程投资。

    Abstract:

    The riverbanks of mountainous rivers are steep,the river cross-section is narrow,and the water level fluctuates greatly.In view of problems such as long shoreline,large amount of earthwork and high project investment,we propose a wharf planar layout type combined steps with S-shaped ramp,which can meet the daily travel needs of mountainous residents and the transportation of production and living materials,and overcome the shortcomings of conventional car-driven ramp wharf.The comparison of engineering examples shows that the wharf layout with steps combined with S-shaped ramp is more adaptable to the terrain characteristics of mountainous rivers.The wharf layout can effectively reduce the occupation of shoreline and the amount of excavation and backfill of earth,reduce the difficulty of construction,and save project investment.

    参考文献
    相似文献
    引证文献
引用本文

阮 健.某山区河流踏步结合S形斜坡码头平面布置[J].水运工程,2025(5):44-48.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-05-19
  • 出版日期:
文章二维码