Abstract:Aiming at the lack of temporary wharf in the assembly and transportation of hydraulic lifting drilling platforms in the port exploration stage in remote overseas areas,this paper takes a port project in West Africa as an example.Through on-site survey and market survey,a gravity-type temporary wharf design scheme with old containers as the main structure is proposed according to local conditions.The article expounds its design ideas and structural characteristics,and uses the finite element model to calculate and analyze the strength of the container structure,ensuring its safety and reliability.Through engineering practice,the construction of temporary wharf is convenient,simple and practical.It successfully solves the problem of drilling platform transportation,and achieves the expected purpose,which has certain reference value.