精密三角高程测量技术在航电枢纽工程中的应用*
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

四川省交通勘察设计研究院有限公司科技项目(232022015)


Application of precision triangulation elevation measurement technology in navigation and electricity hub projects
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对航电枢纽工程建设中无法实施传统跨江(河)水准测量的高等级高程控制测量的问题,开展精密三角高程测量技术的理论和应用实践研究。介绍三角高程测量技术的原理,分析三角高程测量误差影响因素,并提出误差削减措施。以犍为航电枢纽高程控制网测量为研究案例,采用徕卡TS50测量机器人,选择适宜的观测时间窗口,验证全站仪精密三角高程测量代替二等跨江(河)水准测量的可行性。实践表明该方法行之有效,能满足二等水准测量规范限差要求。研究成果对后续大型水运航电枢纽建设中的高等级高程控制测量具有指导意义。

    Abstract:

    In the construction of navigation and electricity hub projects,traditional river-crossing leveling for high-grade elevation control measurement cannot be implemented. In view of this,this paper carries out research on the theory and application practice of a precision triangulation elevation measurement technology. The paper introduces the principle of triangulation elevation measurement technology,analyzes the factors affecting the error of triangulation elevation measurement,and proposes measures for mitigating errors. Taking the elevation control network measurement in Qianwei navigation and electricity hub as a case study,we use the Leica TS50 measuring robot and selects a suitable observation time window to verify the feasibility of replacing second-class river-crossing leveling with total station precision triangulation elevation measurement. Practice shows that the method is effective and can meet the difference limit requirements of second-class leveling specifications. The research results can provide guidance for the high-grade elevation control measurement in subsequent large-scale navigation and electricity hub construction.

    参考文献
    相似文献
    引证文献
引用本文

卢自来,刘超群.精密三角高程测量技术在航电枢纽工程中的应用*[J].水运工程,2023(S1):21-25.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-01-12
  • 出版日期:
文章二维码