港口长周期波问题的应对措施
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Countermeasures against problems of long-period wave in ports
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对长周期波带来的港口作业问题,研究国外港口缓解长周期波成功案例,凝练出抑制长周期波波源、优化平面布局、构建消波结构物、改进系泊配置、开发预报系统等5个方面的应对措施。研究表明,抛石斜坡堤(宽度不小于30 m)、真空系泊系统(MoorMasterTM、Auto Moor等)和液压系泊系统(ShoreTension?)为行之有效且低成本的对策,可供类似工程参考。

    Abstract:

    Regarding the problems of port operations caused by long-period waves,we study the successful cases of long-period wave mitigation in foreign ports,and propose five countermeasures including restraining long-period wave sources,optimizing plane layout,constructing wave absorbing structures,improving mooring configuration and developing prediction system. The study shows that rubble mound breakwater(width not less than 30 m)and vacuum mooring system(MoorMasterTM,Auto Moor,et al.)and hydraulic mooring system(ShoreTension?)are effective and low-cost countermeasures,which may serve as reference for similar projects.

    参考文献
    相似文献
    引证文献
引用本文

周 剑,解东升,李培良,等.港口长周期波问题的应对措施[J].水运工程,2022(7):87-95.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2022-07-04
  • 出版日期:
文章二维码