Optimization of construction schedule of high-piled wharf based on BIM technology
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    高桩码头工程通常规模大、专业性强、施工参与单位众多,由此导致施工信息独立、时效性差,且极大地影响工程进度,造成施工成本浪费。针对此问题,提出高桩码头工程施工进度优化算法,并结合BIM技术建立4D施工管理方法。建立高桩码头Revit模型构件库,以此构建相应码头三维信息可视化模型,再结合高桩码头施工特点,建立基于量子粒子群算法的高桩码头施工进度优化算法,将施工进度优化算法与高桩码头BIM施工模型进行有机整合,利用BIMFILM软件对施工工期信息进行施工全过程的跟踪优化和动态可视化管理。结果表明,该方法实现了高桩码头工程施工进度优化的可视化和信息化管理,所提出的动态优化算法有助于精准预测并同步优化码头施工进度安排、减少施工总成本、提高码头施工管理效率、拓宽BIM技术在水工领域的应用,具有实际推广意义。

    Abstract:

    The project of high-piled wharf is usually large-scale,highly professional and various participants for construction,which leads to the independence and poor timeliness of construction information,and greatly affects the project schedule,resulting in waste of construction cost. In order to solve this problem,we propose an optimization algorithm of the construction schedule,and build a 4D construction management method combined with building information modeling(BIM)technology. We build the component library of the high-piled wharf’s Revit model,construct the corresponding 3D information visualization model of the high-piled wharf,establish the construction schedule optimization algorithm of high-pile wharf based on the quantum particle swarm optimization algorithmin line with the construction characteristics,organically integrate the optimization algorithm for construction schedule with the BIM construction model of the high-piled wharf,and use BIMFILM software to carry out the optimization of construction period information and the dynamic visual management throughout the entire construction process. The results show that this method not only realizes the visualization and information management of construction schedule optimization,but also the proposed dynamic optimization algorithm helps to accurately predict and simultaneously optimize the construction schedule,reduce the total construction cost,and improve the efficiency of wharf construction management,which has expanded the application way of BIM technology in the field of hydraulic engineering with practical significance.

    参考文献
    相似文献
    引证文献
引用本文

原 媛,谢开云,吴双飞.基于BIM技术的高桩码头施工进度优化*[J].水运工程,2022(6):171-177.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2022-06-08
  • 出版日期:
文章二维码