排水板水下施工过程减少回带的措施
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Measures for reducing return of drainage board during underwater construction of drainage board
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在进行水运工程地基处理时,对淤泥、软土等地质环境常采用打设塑料排水板进行排水固化。排水板的打设质量直接影响地基固化效果,对工程安全和质量起到关键性作用,所以排水板打设施工的质量控制尤为重要。排水板施工过程控制要点有扭结、接板、垂直度、板带滤膜破损以及回带等。本文从自重和摩擦两方面入手,着重分析回带原因,提出回带控制措施,并对现场施工工艺做出相应调整和改进。

    Abstract:

    In the foundation treatment of water transport engineering,plastic drainage plates are often adopted for the drainage and solidification of the sludge and soft soil.The quality of the drainage board directly affects the foundation curing effect and plays a key role for the safety and quality of the project.Therefore,the quality control of the drainage board and its construction is particularly important.There are some key points that we must pay attention to kinking,jointing,verticality,damage of plate membrane filter and the return of drainage board.This paper analyzes the causes of the return of drainage board from two aspects including the plate's self-weight and friction,puts forward measures for controlling the return of drainage board,and carries out corresponding adjustment and improvement on the site construction technology.

    参考文献
    相似文献
    引证文献
引用本文

张 辉.排水板水下施工过程减少回带的措施[J].水运工程,2020(S1):147-149.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2020-10-15
  • 出版日期:
文章二维码