Hydrological survey implementation plan for Lancang-Mekong River channel phase II remediation project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    澜沧江—湄公河航道二期整治项目全长631 km,具有落差大、水流湍急、流速大、水情复杂等特点,是典型的国际山区航道。现场水文测量采用多种设备和技术方法,分段管理和实施,包括比降观测、水文断面测量和表面流速与流向测量等,其中电子浮标法在流速大的河段表面流速与流向测量中效果良好,可为长距离山区航道整治水文测量提供参考。

    Abstract:

    The Lancang-Mekong River channel phase II remediation project is 631 km in length,which is characterized by large drop,rapid water flow,large flow velocity,and complicated water regime. Multiple devices and technologies are used for segment management and implementation in hydrographic survey,such as the slop survey,the hydrological section survey and the surface velocity and flow direction surrey ect., among which,the electronic buoy method has a good effect on the measurements of the surface flow velocity and flow direction of a river section with a large flow velocity,thus it may serve as reference for the hydrological survey of long-distance mountainous river channel regulation.

    参考文献
    相似文献
    引证文献
引用本文

江木春,韩亚民,李 勇.澜沧江—湄公河航道二期整治项目水文测量实施方案[J].水运工程,2020(10):110-114.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2020-10-10
  • 出版日期:
文章二维码