    摘要:

    针对消浪肩台对斜坡堤顶高程影响的问题,以某新建码头防波堤工程为基础,对比分析了平均越浪量和堤顶高程的多种经验公式计算结果,并和断面物理模型试验结果进行比较。经验公式计算结果显示,相同顶高程条件下,设有消浪肩台的斜坡堤可显著降低堤顶越浪量;经验公式和断面物理模型试验结果显示,设有消浪肩台的斜坡堤可显著降低顶高程。

    Abstract:

    Aiming at effect of berm on the top level of rubble mound breakwater,based on the breakwater project of a new port,the paper analyzes and compares the empirical formula calculation results about mean wave overtopping and top level,and also makes a comparison between the empirical formula calculation results and physical section model test results. The results of empirical formula show that mean wave overtopping of breakwater with berm could be reduced effectively when the top level is same,and the results of empirical formula and physical section model test study shows that the top level of rubble mound breakwater with a berm can be significantly reduced.

    参考文献
    相似文献
    引证文献
引用本文

王 军,李雪野,陈 琦,等.消浪肩台对斜坡式防波堤堤顶高程的影响[J].水运工程,2020(9):113-117.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2020-09-02
  • 出版日期:
文章二维码