素咬合止水桩土石围堰监测及变形分析*
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

广州市珠江科技新星专项资助项目(201906010023);广州市珠江科技新星专项资助项目(201806010164)、国家重点研发计划专项资助项目(2017YFC0805303)


Monitoring and analysis of deformation for earth-rock cofferdam with pure concrete linked water cut-off pile
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为掌握素咬合止水桩土石围堰的变形规律,对咬合桩土石围堰不同位置、不同降水阶段、不同监测项目的监测数据进行分析总结。结果表明:围堰在第一次抽水期间变化较大,经过回灌、坡脚抛石、围堰加宽加固后,第二次抽水期间围堰变化趋势明显减缓;围堰中部的变形最大,靠岸位置的变形稍大,岸坡位置在整个抽水期保持稳定;同一位置附近的不同监测项目,其增长趋势基本一致。经过分析,最终确定围堰降水速率为400~500 mm/d最为合理,既能保证围堰的安全又能在一定程度上加快降水速度从而确保工期。

    Abstract:

    In order to master the deformation regularity of earth-rock cofferdam with pure concrete linked water cut-off pile,the monitoring data of earth-rock cofferdam with pure concrete linked water cut-off pile in different position of different dewatering stage for different monitoring items was analyzed and summarized.The results showed that:the deformation of cofferdam was remarkable large during the first time dewatering,but the increase trend of cofferdam deformation was slowed down obviously during the second time dewatering after refilling sea water into dock,refilling riprap at the foot of cofferdam,widening and strengthening cofferdam;the deformation of the cofferdam in the middle was largest,near landing position was slightly large and the landing position kept stable during entirely dewatering period;the increase trend of monitoring data from different monitoring items in the same position was consistent.After analyzing,the rate of dewatering 400~500 mm/d was determined as the most reasonable finally which can ensure the safety of cofferdam and to some extent speed up the dewatering making sure the construction time.

    参考文献
    相似文献
    引证文献
引用本文

陈明杰,桑登峰,娄学谦.素咬合止水桩土石围堰监测及变形分析*[J].水运工程,2020(8):195-201.