The breakwater construction technology at a canal entrance under the influence of long-period waves
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    波浪是影响沿海防波堤最重要的水动力因素之一,长周期波能够穿透可透浪防波堤,对防波堤防护内的水动力环境产生极大影响,给防波堤等水工建筑拆除及新建施工带来一定的困难。针对西非某运河口门处防波堤工程,根据其处于长周期波影响环境下、水上施工困难等问题,分析防波堤各分项工程的施工特点、难点,并制定相应的解决方案,最终顺利完成防波堤的改建施工。

    Abstract:

    Wave is one of the most important hydrodynamic factors affecting coastal breakwaters.The long-period wave can penetrate the wave-permeable breakwaters,which has great impact on the hydrodynamic environment inside the breakwater,and brings some difficulties to the demolition and new construction of the breakwater and other hydraulic structures.In view of the breakwater project at the entrance of a canal in west Africa,the construction characteristics and difficulties of each item of breakwater project are analyzed according to the problems such as the long period wave influence environment and the difficulty of water construction,and the corresponding solutions are formulated,finally the reconstruction of breakwater is completed successfully.

    参考文献
    相似文献
    引证文献
引用本文

许万胜,谭 斌.长周期波影响的河口防波堤施工技术[J].水运工程,2019(S1):16-20.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2019-05-15
  • 出版日期:
文章二维码