    摘要:

    外海桩柱结构受波浪作用强烈且动力性质明显。以国内某LNG码头的高桩系缆墩台作为工程背景,利用ANSYS进行了波浪作用下的结构时程动力分析。计算结果表明:在同一波要素下,模拟的不规则波浪产生的结构位移和应力响应峰值大于规则波10%~20%;在结构时程动力分析中初期波动剧烈的结果可以舍弃。

    Abstract:

    Offshore pile structure is strongly influenced by the wave action and has obvious dynamic characteristics.Taking a LNG terminal’s high pile mooring pier as the engineering background,the time-history dynamic analysis of the structure under wave action is carried out by using ANSYS.The results show that under the same wave parameters,the peak values of structural displacement and stress response caused by the simulated irregular waves are about 10%~20% larger than that caused by regular waves,and for the dynamic time-history analysis,the initial drastic fluctuation results can be discarded.

    参考文献
    相似文献
    引证文献
引用本文

林岳,曹代利.波浪作用下高桩墩式结构时程动力分析[J].水运工程,2019(8):74-77.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2019-08-09
  • 出版日期:
文章二维码