大型绞吸船最小挖宽和挖深的计算方法
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Calculation method of minimum dredging depth and width of heavy-duty cutter suction dredger
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对大型绞吸挖泥船进行硬底质航道疏浚施工时,其最小挖宽和挖深受到限制的问题,提出通过计算确定绞吸船最小挖宽和挖深的解决方案。分别依据标准规范和船舶几何尺寸,考虑多种波浪条件下的绞吸船最小挖深挖宽计算方法,得出某工程大型绞吸船在进行航道施工时的最小挖宽和挖深,经工程实践证明该方法可行。

    Abstract:

    When a heavy-duty cutter suction dredger is used for rock channel dredging,the minimum dredging depth and width are under restrictions.We carry out the computing method of confirming the minimum dredging depth and width.We introduce the calculation method of the minimum depth and the width under different wave conditions,which is based on standard specification and geometry size of the dredger.We work out the minimum dredging depth and width by this method in a project example.The method is proved to be useful.

    参考文献
    相似文献
    引证文献
引用本文

陈飞飞,刘 斌,郑选斌.大型绞吸船最小挖宽和挖深的计算方法[J].水运工程,2018(3):190-192.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2018-03-19
  • 出版日期:
文章二维码