外高桥六期工程商品汽车码头自动化立体整车仓库设计
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Mechanical automated stereo garage design of Waigaoqiao Port phase VI project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    通过对外高桥六期工程商品汽车码头自动化立体整车仓库项目中影响自动仓库总体规划设计的布局模式、智能控制、作业流程等因素进行分析,特别针对自动化立体整车仓库的工艺流程系统和流程自动控制系统进行剖析,提出自动化立体整车仓库切实可行的规划设计思路和策略,为同类自动化仓库设计提供实践经验及参考。

    Abstract:

    The paper analyzes the layout,intelligence control and working procedure in the mechanical automated stereo garage project of Shanghai Waigaoqiao Port phase VI project which influence the overall planning and design of the mechanical automated stereo garage,probes into the automated control system of the process system and process automated control system of the garage,and puts forward design ideas and strategies for the mechanical automated stereo garage,could be a practical reference to the field of mechanical automated garage.

    参考文献
    相似文献
    引证文献
引用本文

倪立土.外高桥六期工程商品汽车码头自动化立体整车仓库设计[J].水运工程,2018(2):81-86.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2018-02-09
  • 出版日期:
文章二维码