某煤码头升级改造方案优化设计
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Optimization design of a coal terminal upgrade program
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对传统高桩墩式码头加固方案的施工困难等问题,提出了在墩台前新建柔性结构承担新荷载的码头加固方案。并从安全性、适用性、经济性、施工便利性等方面探讨墩台前设置柔性靠船桩簇方案的优缺点和适应性。

    Abstract:

    This paper has discussed difficult construction and other issues in the reinforcement scheme for traditional high-piled pier wharf,and puts forward a new scheme in which a flexible structure is constructed in front of the pier to bear additional loads.The advantages and disadvantages and adaptability of this new scheme with flexible clustered fender piles in front the pier have been analyzed from aspects of safety,applicability,economy and construction convenience.

    参考文献
    相似文献
    引证文献
引用本文

周远方,陈 新.某煤码头升级改造方案优化设计[J].水运工程,2018(2):69-73.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2018-02-09
  • 出版日期:
文章二维码