洋山深水港区四期工程大直径超长嵌岩桩精细化施工质量控制
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Fine quality control of large diameter and ultra-long rock-socketed pile construction in Yangshan Deep-water Port Phase Ⅳ project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    嵌岩桩作为桩基工程的重要组成部分,施工环节多、质量控制难度大。从洋山深水港区四期水工码头嵌岩桩施工出发,从嵌岩桩成孔、安装钢筋笼、混凝土浇筑等方面,探讨通过精细化管理措施确保施工质量,并形成标准化控制流程,以供参考。

    Abstract:

    Rock-socketed pile with character of plenty of construction links is an important part of pile foundation project,and its quality control is difficult.Based on rock-socketed pile construction in Yangshan Deep-water Port Phase Ⅳ project, this article discusses the fine management measures from making holes of rock-socketed piles,installation of steel cage,concrete pouring,etc.,to ensure the construction quality of the fine management measures,and to form standard control procedures.

    参考文献
    相似文献
    引证文献
引用本文

沈树茂.洋山深水港区四期工程大直径超长嵌岩桩精细化施工质量控制[J].水运工程,2017(S1):77-81.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2017-07-10
  • 出版日期:
文章二维码