景洪水力式升船机岔管群结构设计
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Structural design of the branch pipes of hydraulic ship lift for Jinghong
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    岔管群是水力式升船机输水系统的重要组成部分,其布置及设计较复杂。针对景洪水电站水力式升船机岔管的受力特点,采用数值计算方法对水力式升船机典型的三分梁式岔管及四通岔管进行敏感性分析。结果表明:岔管的结构形式合理可行,满足水力式升船机输水系统布置的要求。研究成果可为水力式升船机岔管群结构设计提供科学依据。

    Abstract:

    The branch pipes are the important part of the hydraulic ship lift water conveyance system.Aiming at the force characteristics of the branch pipe in the hydraulic ship lift of Jinghong hydropower station,we apply the numerical calculation method for sensitivity analysis of four-girder reinforced trifurcations and four crossed pipe.The results show that the structure of the branch pipe is reasonable and feasible to meet the requirements of the water conveyance system layout of the hydraulic ship lift.The research can provide a scientific basis for the design of the bifurcated pipes of the hydraulic ship lift.

    参考文献
    相似文献
    引证文献
引用本文

杨丽娜,伍鹤皋,凌 云.景洪水力式升船机岔管群结构设计[J].水运工程,2017(10):25-31.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2017-10-12
  • 出版日期:
文章二维码