支撑式平台整平船桩腿拔桩力计算
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Calculation of supporting platform leveling ship leg pile pulling force
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    结合港珠澳大桥沉管隧道基础整平工程,采用了多种计算方法分析整平船桩腿在不同地质条件下的插桩和拔桩,得出了自升式抛石整平船桩腿在工作状态下的入土停止层,以及在整平船插腿施工中的抗压极限承载力和桩腿抗拔极限荷载,同时提出在特殊地质条件下的预控措施,并通过工程施工实践验证,证明该分析计算方法是正确的。

    Abstract:

    Combined with the Hong Kong Zhuhai Macao Bridge Tunnel Engineering foundation leveling, the calculation methods are put forward to analysis inserting and pulling pile of leveling ship legs in different geological conditions. It is concluded the leg buried layer of self elevating riprapping leveling ship in the work state , and the ultimate bearing capacity and pullout ultimate load of pile legs in the construction of the leveling ship inserting legs. At the same time, pre control measures in the special geological conditions are put forward. The practice proves that the analysis and calculation method is correct.

    参考文献
    相似文献
    引证文献
引用本文

冯海暴,曲俐俐,魏红波.支撑式平台整平船桩腿拔桩力计算[J].水运工程,2017(4):185-189.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2017-04-17
  • 出版日期:
文章二维码