    结合国内某船闸工程,针对集中输水系统中简单消能工和格栅消能室两种布置形式,采用RNG κ-ε紊流模型和自由水面处理技术的VOF法对输水过程闸室流态进行计算,在此基础上分析了集中输水系统镇静段长度的选择方法,给出合理的量化方法。两种典型集中输水系统计算表明,以闸室沿程平均紊动能小于0.02 m2/s2作为镇静段长度控制条件,确定的镇静段长度与规范相符且更明确,可以作为集中输水系统镇静段长度量化判别指标。

    Abstract:

    Combining with a domestic ship lock project,flow regime in chambers of two types of filling system through the head,in which setted simple energy dissipater and grid stilling chamber,was simulated by RNG κ-ε turbulence model and VOF method.Based on analysis of the simulation,a reasonable quantitative method was given.This simulation turned out that taking turbulence flow energy less than 0.02 m2/s2 as a quantitative indicator to determine the length of mitigative section during filling process meet the norms.

    参考文献
    相似文献
    引证文献
引用本文

赖东亮,李中华,赵宇航,等.集中输水系统镇静段长度数值计算*[J].水运工程,2016(12):76-81.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-12-16
  • 出版日期:
文章二维码