传力杆在高桩码头升级改造工程中的应用
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

交通运输部建设科技项目(2014328224040)


Application of upgrading and reconstruction for high-piled wharf based on dowel bar
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为保证港口安全,适应沿海港口吞吐量增长和到港船舶大型化发展,对已建高桩码头进行升级加固改造成为必然趋势。作为一种新型方案,传力杆技术已在部分高桩码头升级改造中得到应用。结合相应工程实例,对传力杆加固高桩码头升级改造技术特点、设计计算方法及相应的施工工艺进行系统阐述,并采用专业软件进行码头整体建模,对传力杆加固高桩码头效果进行了验证,结果表明横梁和桩基内力都有一定程度的改善。

    Abstract:

    In order to ensure the safety of the port and adapt to the growth of the coastal port throughput as well as large-scale development of the ship,the upgrading and strengthening of the high piled wharf has become an inevitable trend.As a kind of new scheme,the dowel bar technology has been applied to upgrading and reconstruction for high-piled wharf.Combining with engineering examples,the dowel bar of upgrading technical features for high-piled wharf reinforcement,design calculation method and the corresponding construction technology is described;using professional software for the wharf modeling,the dowel bar reinforcement effect of high pile wharf is verified.The results show that the beams and internal force of pile have a certain degree of improvement.

    参考文献
    相似文献
    引证文献
引用本文

尹纪龙,孙熙平,李赛峰,等.传力杆在高桩码头升级改造工程中的应用[J].水运工程,2016(11):83-87.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-11-17
  • 出版日期:
文章二维码