Innovative application of power supply system for Yangshan deepwater port phase IV project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    洋山四期工程供电系统广泛应用了新技术、新产品、新材料、新工艺。如:过电压保护装置选用六柱全相双安全保护装置,为设备更加可靠、安全的运行提供了保障;使用DEHN系列接地夹具不但给施工带来了便利,而且更易于控制施工质量;采用烙克赛克穿隔密封系统有效解决了电缆密封和日后的扩容问题。

    Abstract:

    New technology,new product,new material,new process are widely used in the power supply system of Yangshan deepwater port phase IV project.For example,the over-voltage protector with dual safety protection device for all phases in six posts guarantees more reliable and safe operation of the equipment;the use of DEHN series earth clamp not only facilitates the construction,but also ensures easy control of construction quality;the roxtec cross sealing system effectively solves the problem of cable sealing and future expansion.

    参考文献
    相似文献
    引证文献
引用本文

姚 宇,胡建勇,陈伟治.洋山四期工程供电系统创新应用[J].水运工程,2016(9):163-166.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-09-08
  • 出版日期:
文章二维码