Handling technology design for automated container terminal of Yangshan deepwater port phase IV project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对洋山四期工程的特点,选择自动化装卸工艺系统,并通过对工艺系统设备选型和平面布置的细化和优化,较好地解决了码头装卸与水平运输环节的衔接、陆域狭小对大型深水泊位能力的制约、堆场海陆侧轨道吊作业量不均衡、互拖及运距长等主要问题,为发挥集装箱码头自动化的优势奠定基础。

    Abstract:

    According to the engineering characteristics of Yangshan deepwater port phase IV project,we choose the automatic handling technology system.Optimizing the equipment selection and layout of container terminal automation technology,we solve problems including connection between the wharf handling and horizontal transportation system,the capacity of container yard restricted by the narrow land,balanced utilization of the RMG between the seaside and the landside in one yard,high handling costs of long-distance round-trip,etc.,and lay a solid basis for giving full play to the superiority of the automatic container terminal.

    参考文献
    相似文献
    引证文献
引用本文

吴沙坪,何继红,罗勋杰.洋山四期自动化集装箱码头装卸工艺设计[J].水运工程,2016(9):159-162.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-09-08
  • 出版日期:
文章二维码