洋山四期工程码头现浇面层混凝土裂缝控制
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Control of concrete cracks in cast-in-place surface of Yangshan phase Ⅳ project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为减少和控制码头现浇面层裂缝,从设计、施工、原材料等方面对裂缝产生的机理进行分析,并提出通过优化原材料质量减少混凝土收缩量的技术路径和量化要求以及通过完善施工过程管理减少混凝土干燥裂缝的技术措施,可以有效减少面层混凝土龟裂等不规则裂缝,结合其他设计构造措施,达到控制码头面层裂缝的目的。

    Abstract:

    To reduce and control the cast-in-place crack on the wharf surface layer,we analyze the mechanism of cracks from aspectsincluding design,construction and raw materials,and put forward the technical path and quantitative requirements to reduce the shrinkage of concrete by optimizing the quality of raw materials.Taking perfect construction process management measures for reducing concrete drying cracks,we can reduce effectively irregular cracks in the surface layer concrete.,Combining with other design measures,we can control the wharf surface layer crack.

    参考文献
    相似文献
    引证文献
引用本文

顾祥奎,王晓晖,庄 骅.洋山四期工程码头现浇面层混凝土裂缝控制[J].水运工程,2016(9):140-146.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-09-08
  • 出版日期:
文章二维码