Maintenance dredging scheme of Shangluoqi reach in falling stage of Three Gorges Reservoir
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    受三峡水库175 m试验性蓄水影响,三峡库区上洛碛河段发生泥沙累积性淤积,泥沙主要落淤在河段深槽及边滩,淤积量不大,但上洛碛河段在消落期航道尺度富余不大,边滩少量泥沙淤积也能恶化该处航道条件。利用实测地形资料,对2011—2012年度上洛碛河段航道条件变化进行分析,并提出消落期相应的航道维护方案。

    Abstract:

    After the 175 m trial impoundment of the Three Gorges Reservoir,cumulative siltation occurred in Shangluoqi reach in Three Gorges Reservoir area,with a small amount and mainly in the deep channel and beach.Since channel scale margin of Shangluoqi reach in the fluctuating period is not large,a little amount of sediment deposition can worsen the channel conditions.This paper analyzes channel condition changes of Shangluoqi reach during 2011—2012 using measured terrain data,and puts forward the maintenance dredging scheme of Shangluoqi reach in the falling stage of the Three Gorges Reservoir.

    参考文献
    相似文献
    引证文献
引用本文

苏 丽,王 涛,刘 陈,等.三峡库区上洛碛河段消落期维护疏浚方案[J].水运工程,2016(7):158-164.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-07-12
  • 出版日期:
文章二维码