长江南京以下12.5 m深水航道一期疏浚施工中的难点与对策
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Construction difficulties and countermeasures of dredging project in the first phase of 12.5 m deepwater channel of the Yangtze River below Nanjing city
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    长江南京以下12.5 m深水航道一期疏浚工程作为国内首个长江内河疏浚吹填工程,在施工期间遇到了前所未有的困难和技术难题。基于对长江内河、细粉砂和亚黏土土质等复杂工况条件的分析,改进耙头和耙齿,优化挖泥施工工艺参数和艏吹方案,提高施工效率,为今后大型自航耙吸挖泥船在长江内河疏浚和艏吹施工提供借鉴。

    Abstract:

    In the first dredging and pumping ashore project in the Yangtze River,unprecedented difficulties and technical problems were encountered during the construction.Based on the analysis of the Yangtze River,fine silt,clay and other complex project conditions,the drag head and teeth were improved,the craft parameters of dredging and the program of pumping ashore were optimized,which improved the construction efficiency and provided reference for the future dredging and pumping ashore construction of self-propelled trailing suction hopper dredger in the Yangtze River.

    参考文献
    相似文献
    引证文献
引用本文

朱时茂,郭素明.长江南京以下12.5 m深水航道一期疏浚施工中的难点与对策[J].水运工程,2016(4):7-12.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-04-12
  • 出版日期:
文章二维码