For the low efficiency,long time consumption and no guarantee of accuracy of the traditional manufacturing method of cross section production in river model,we develop a system to make the original data of cross section converted to performing data automatically,which is characterized by stable operation,high efficiency and low cost,to meet the demand of model test.