    摘要:

    三峡水库蓄水初期,变动回水区河段滩险泥沙冲淤规律发生了变化。为保障库尾航道和重庆港区安全畅通,每年均需要进行维护性疏浚。本文总结近年来三峡水库变动回水区维护性疏浚开展情况,对实施过程中存在的问题和经验进行分析,对施工时机的选取和施工顺序的选择提出建议,为后续整治工程提供借鉴。

    Abstract:

    The impoundment of the Three Gorges reservoir changed the rapids’ sedimentation rules within the fluctuating backwater area.To guarantee the safe and smooth operation of the tail of the reservoir channel and Chongqing port,maintenance dredging is needed every year.This paper summarizes the situation of maintenance dredging at the Three Gorges reservoir fluctuating backwater area,analyzes the problems and experience during implementation of the dredging engineering,and gives suggestions to the dredging time and sequence,to serve as reference for the future dredging engineering.

    参考文献
    相似文献
    引证文献
引用本文

马李伟,贺 勇.三峡水库变动回水区维护性疏浚施工组织[J].水运工程,2015(11):179-183.