钢混复合桩吊运工艺分析
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Lifting technology for steel concrete composite pile
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    钢混复合桩结合了混凝土管桩造价低和钢管桩抗弯性能好的优点,在满足工程质量要求的前提下又达到了降低成本的目的。对钢混复合桩6点吊的设计计算方法进行推导并结合现场试验进行验证,在此基础上探讨了吊桩参数的敏感性,同时依托工程试验分析了钢混复合桩4点吊与6点吊之间的异同,为钢混复合桩的吊运工艺提供参考。

    Abstract:

    The steel concrete composite pile combines the low cost of concrete pipe pile and good flexibility of steel pipe pile,and achieves the purpose of reducing the cost under the premise of meeting the project quality requirement.The design method of lifting steel concrete composite pile with six lift points is derived and compared with field test,based on which,the parameter sensitivity of lifting pile is discussed.Meanwhile,this paper analyzes the similarities and differences between six and four lift points based on field test.The study may serve as reference for the lifting technology of the steel concrete composite pile.

    参考文献
    相似文献
    引证文献
引用本文

俞立新,卓 杨,方利国.钢混复合桩吊运工艺分析[J].水运工程,2015(11):170-174.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-11-17
  • 出版日期:
文章二维码