Whole life cycle investment control for large civil engineering project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    大型土木工程项目是一项十分复杂的系统工程,具有投资巨大、周期长、参与方众多、风险高等特点,导致企业投资回报存在较大偏差。以珠海横琴综合开发项目为例,综合运用现代企业管理理论、期权理论、工程管理理论、计量经济学理论和信息论,对大型土木工程项目投资的全团队、全过程控制及全生命周期投资控制信息的集成管理进行探讨,提出项目全生命周期投资管控模型,供类似工程参考。

    Abstract:

    There’re two bars outside the entrance of Minjiang river 0.2 million DWT entrance channel,i.e.the inner bar and the outer bar.It is a representative river estuary at which sand mainly comes from the land.This paper probes into two issues:1) To carry out an analysis on the formation causes of the outer bar according to the topography,flow & river type and based on the real-measured data concerning hydrology and sediment,and get the conclusion that the circulating current in the river bend is the main formation cause of the outer bar.2) Based on the analysis of the real-measured topographic map of the river estuary from 1886 to 1986,and considering the siltation process at the outer bar area,to propose the concept of “current having the characteristics of automatic transmission of resistance”,and explain theoretically the mechanism of diversion and bifurcation of the main current and put forward the condition of diverting.

    参考文献
    相似文献
    引证文献
引用本文

金 柳.大型土木工程项目全生命周期投资管控[J].水运工程,2015(5):174-178.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-05-15
  • 出版日期:
文章二维码